Solar panels: Aigle, Vaud Plan your project 2026

Your solar project: Aigle. Prepare a timetable showing procedures, approvals and work in their actual sequence. Price the necessary electrical distribution board changes and protection devices. Reserve space and access for inspections and future replacements. Agree on tests, inspections and documents to be provided at handover.

Verify the grid operatorCompare detailed quotesScenario: 8 kWp

Roof potential

To assess

Purchase — calculation hypothesis

CHF 0.260/kWh

Net cost — model

CHF 16'960

Payback — model

12-16 years

The 8 kWp scenario above uses the cantonal model assumptions: indicative output, 40 % self-consumption, hypothetical purchase and export tariffs, installed costs of CHF 2 200 to 2 800/kWp and assumed Pronovo support of CHF 360 to 400/kWp. It is not a local quote. Recalculate using your roof, hourly demand, contracts and confirmed grants; include fees, losses and replacements.

Your roof: Aigle

For a detached house, check roof condition, shading and electrical capacity before signing. A single owner’s decision still requires a technical roof survey.

In all cases, the useful surface area is almost always less than the gross surface area announced. Skylights, chimneys, setbacks, shading and future maintenance needs must be integrated before talking about final power.

Request the weather assumptions, losses and monthly results behind the stated output. Distinguish avoided purchase costs from the tariff paid for exported surplus.

Exposure and access: Aigle

Request a survey of nearby shading and the horizon, with monthly generation estimates. Compare options for your building using the same weather data and loss assumptions.

Use the building’s hourly consumption to size the project. Keep the simulation assumptions so results can be compared after commissioning.

Full cost and grants: Aigle

The displayed scenario uses an indicative installed cost for 8 kWp. A quote must specify equipment, roofing and electrical work, connection, inspections and fees before deducting confirmed grants.

Programmes depend on the municipality and available funds. Obtain written confirmation of amounts, timing, limits and combined support for your address before including them in the budget.

Prepare a timetable showing procedures, approvals and work in their actual sequence. Identify the service contact and stated response times after commissioning.

Output must be assessed for the actual roof, its orientation, shading and condition. Tariffs depend on the grid, product and contract; a cantonal average does not replace your bill.

Building procedures: Aigle

Assess shifting compatible loads to solar hours before adding storage. Record amounts, deadlines and revision terms in the offer.

A serious estimate specifies who prepares the announcement, who manages the connection, who follows the administrative back and forth and how any comments are absorbed into the planning.

In the canton of Vaud, distinguish between Pronovo, municipal aid and Buildings Program if solar accompanies a renovation. If this timeline is poorly managed, you lose time and sometimes value on aids.

Request plans, equipment references and service boundaries before accepting a price. Confirm voltages, currents and module compatibility with the selected inverter.

Compare installers: Aigle

When comparing installers, check access to the installation site. Then check compatibility between the modules and inverter. These details matter more than the advertised price alone.

The quality gaps are quickly seen in the annexes: level of technical inspection, self-consumption assumptions, electrical diagram, service after commissioning and clarity of service limits.

Before choosing an installer, ask who attends the site after a fault, the travel charges and stated response time. A registered office address does not establish service availability for your building.

Check building protection and appearance requirements with the relevant authority. Request a schedule that accounts for weather, access and team availability.

Places cited on this page — confirm service coverage

Aigle

Frequently asked questions: Aigle

Prepare these questions about the roof, costs, storage and procedures before comparing offers.

What should I check during the roof survey?

Show chimneys, roof windows and other obstacles on the installation layout. Record who installs, inspects and supports each part of the system in the contract.

How should I compare self-consumption and exports?

Compare avoided purchase costs and surplus export prices with your hourly demand. Self-consumption reduces purchases when generation is used on site; the choice also depends on full cost and losses.

How should I assess adding a battery?

First compare an option without storage for the same demand. Measure usable roof area with obstacles and required clearances included. Include maintenance, insurance and foreseeable replacements in lifetime cost.

Which procedures should I confirm for this building?

The procedure depends on the plot, building and integration. Present the plan to the municipality to confirm notification or permit requirements and any protection constraints before ordering.

What should I request from installers?

When comparing installers, check an on-site technical survey before relying on sales claims. Then check the value of exported surplus using cautious assumptions. These details matter more than the advertised price alone.

Guides to nearby towns

Prepare your solar project: Aigle

Compare detailed offers, check the construction method and lock in the right order between roofing, quotes and procedures.

Move from information to action

Receive a personalised estimate, compare your options and prepare your solar project with a clear process.