TL;DR

Compare complete quotations. The example below uses selected cost assumptions, not a measured market average. Grants, roof work and batteries are separate budget items.

A budget example you can check

Gross budget equals capacity multiplied by the cost assumption. Only the Pronovo estimate for a surface-mounted system is deducted here. An integrated system differs technically: do not assume identical installation costs without a quotation. Roof renovation, battery, additional grid reinforcement and tax effects are excluded.

PowerGross — modelPronovo — surface-mountedNet — model
6 kWpCHF 13200–16800CHF 2160CHF 11040–14640
8 kWpCHF 17600–22400CHF 2880CHF 14720–19520
10 kWpCHF 22000–28000CHF 3600CHF 18400–24400

What the quote should detail

Modules and an inverter do not make a complete quotation. Check scaffolding, mounting, electrical work, waterproofing, metering, connection, commissioning and grant-application documents. Specify who approves additional work and whether VAT and removal are included. Unclear exclusions make comparison harder than a difference in module prices.

Request exact model numbers, kWp capacity, a layout and a generation simulation. Product, performance and installation warranties differ: check the provider, duration, exclusions, labour costs and fault procedures. A long module warranty does not automatically cover scaffolding and replacement.

Self-consumption, feed-in and future costs

Value avoided purchases at the variable tariff actually saved. Fixed and metering charges do not disappear automatically. Price surplus using the applicable feed-in contract and specify whether guarantees of origin are included. An annual average may be insufficient for seasonal or dynamic prices.

A heat pump and EV change both the amount and timing of consumption. Compare battery and no-battery options using the same assumptions. More annual generation does not eliminate grid purchases on winter nights. Test a cautious scenario with lower generation and lower feed-in payments.

Calculation tools and assumptions

Frequently asked questions

Does this table give the current Swiss average price?+

No. CHF 2’200–2’800 per kWp are calculation assumptions. The table is not based on a representative survey of quotations. Request several quotes for the same capacity, equipment and scope.

How is Pronovo calculated in the example?+

For a new 2–29.9 kWp system with self-consumption commissioned in 2026: CHF 360/kWp for surface-mounted or CHF 400/kWp for integrated systems, excluding bonuses. On 22 September 2026, the official grant calculator confirmed CHF 2’880 and CHF 3’200 respectively for 8 kWp. Type, date and eligibility conditions remain relevant.

How much should you budget for the battery?+

Request a separate quote covering usable capacity, power, installation, controls and any backup function. A battery is an additional investment. Deduct a grant only if the local programme covers your project. Increased self-consumption alone does not establish profitability.

Is the payback period guaranteed?+

No. Dividing net cost by the annual benefit gives only an initial indication. A complete study includes maintenance, finance, ageing, replacements, future tariffs and residual value. Consumption must coincide with generation.

Sources & method

Official sources for grants and tariffs; the cost assumptions are not official price statistics.

This content is for information only. For your project, verify prices, grants, timelines, permissions and expected returns with the relevant authorities, grid operator and installer, and check the applicable contracts.

Some pages also invite you to get in touch or highlight services, and may contain other commercial messages from the site operator.

Move from information to action

Receive a personalised estimate, compare your options and prepare your solar project with a clear process.

Callback request