Privacy choice

Google, HubSpot and Reddit are activated after acceptance. Clarity, Meta and Tawk.to can load independently. Details: cookie policy.

Finance & Taxation October 2026 6 min read

Solar panel tax deduction in Switzerland: complete guide 2026

Editorial responsibility: Franck Tournier · Report a fix

TL;DR

In Switzerland, solar investment is tax deductible on existing buildings according to federal and cantonal rules as 'energy savings costs'. The effect depends on the taxable income, the building, the canton and the aid received; always calculate the net charge after subsidies.

Principle: a solar installation = energy savings costs

In Switzerland, the Federal Law on Direct Federal Tax (LIFD) and cantonal laws allow costs to save energy or use renewable energy to be deducted. A photovoltaic installation, a storage battery or an energy monitoring system fall into this category. The deduction applies to taxable income — not the tax itself.

Direct federal tax (IFD): check the treatment of the existing building

For existing buildings, investments intended to save energy or use renewable energies can be admitted according to federal and cantonal tax rules. New construction, aid received and the private/professional portion may change the calculation: keep the supporting documents and have the treatment validated if the amount is large.

Cantonal and municipal taxes: the real opportunity

This is where the main tax advantage lies. Most cantons allow owner-occupiers to deduct energy investments as extraordinary maintenance costs in their cantonal declaration. VD example: deduct the investment in the “property income conservation costs” form (F-IC, energy saving works section). GE example: annexed declaration for real estate work costs (ICC).

Calculation of tax savings

Simplified example, subject to tax eligibility: CHF 16 000 in expenditure minus CHF 3 000 in grants gives CHF 13 000 in eligible costs. With an assumed marginal tax rate of 30%, the tax saving is CHF 3 900. Deduct grants before calculating the deduction; do not count the same benefit twice.

What is deductible: precise list

Itemise panels, inverter, storage, mounting, cabling, connection and labour on the invoice. Eligibility depends on the rules applicable to the building and canton. Roof work can constitute maintenance, improvements or energy measures: classify it separately rather than automatically treating it as deductible or non-deductible.

From 2029: new tax reform

The reform takes effect on 1 January 2029. It removes the federal deduction for energy-saving measures; cantons can retain certain deductions for a limited period. Distinguish an investment under current rules from a project planned from 2029 and check the cantonal treatment before signing.

How to declare it: practical points

1. Obtain an itemised VAT invoice from your installer. 2. Keep the Pronovo confirmation and installation report. 3. Declare the tax-eligible net costs after deducting grants under the applicable property maintenance or energy-saving category. 4. Provide invoice evidence as required. Ask your tax authority to confirm the eligible amount and supporting documents.

Frequently asked questions

Does the tax deduction also apply to the battery?+

Confirm the treatment of storage for the specific installation and building. An itemised invoice helps the assessment; having a battery does not by itself guarantee deductibility.

Can we deduct over several years?+

Eligible energy expenditure that cannot be fully taken into account in the investment year can, under the applicable rules, be carried forward to the next two tax periods. Ask your tax authority to confirm the order of deductions and supporting documents.

Is the deduction possible if I am a tenant and I finance the installation for my landlord?+

No. The tax deduction applies to the owner of the real estate on which the system is installed. If you are a tenant, you cannot deduct an installation on property that is not yours.

How to justify the deduction during a tax audit?+

Keep: the detailed invoice from your installer (with ALL items: panels, inverter, battery, wiring, labor), the Pronovo certificate, the commissioning report, and any cantonal document. In the event of an inspection, these documents prove that the investment is indeed an approved energy saving system.

Sources & method

Current rules, costs after grants and the reform applying from 2029: consult the official sources below.

This content is for information only. For your project, verify prices, grants, timelines, permissions and expected returns with the relevant authorities, grid operator and installer, and check the applicable contracts.

Some pages also invite you to get in touch or highlight services, and may contain other commercial messages from the site operator.

Move from information to action

Receive a personalised estimate, compare your options and prepare your solar project with a clear process.

Callback request