Definition · Specific Switzerland

One-off subsidy (RU)One-time federal grant

TL;DR

The RU is the Swiss federal grant managed by Pronovo. The amount depends on the scale and configuration; use the official tariff calculator before integrating it into the budget. It is distinct from the feed-in rate.

Definition

The Single Payment (RU) is the federal instrument which subsidizes new PV installations with a single lump sum payment, replacing the old RPC since 2018.

💰

Amount

Tarificateur

🎯

For 8 kWp

Confirm

📊

% of gross cost

Variable

⏱️

Payment

After validation

Technical explanation

Financed by the network supplement and managed by Pronovo SA. The calculation combines the parameters published by Pronovo, the installed power and possible correction factors. Typical small installation procedure: commissioning -> installation report -> mysolar.ch file -> validation and payment according to Pronovo schedule.

Swiss context

The RU represents 16–22% of the gross cost of a residential installation. Scale and procedure to be checked at the time of the quote. Accumulation possible only with truly confirmed cantonal or municipal aid.

Related terms

Related guides

FAQs — One-off subsidy (RU)

What is the difference between RU and RPC?+

RPC = guaranteed feed-in tariff for 20 years (closed since 2018). RU = single lump sum payment after installation — simpler but without guarantee of future income.

Can the RU be removed?+

The RU is registered in the LEne. Any removal requires legislative amendment. Approved facilities are protected. The program is regularly renewed.

Sources & method

Check equipment values in the offered model’s datasheet and warranty terms. Confirm grant, permit and connection requirements with the responsible programme, municipality and grid operator.

This content is for information only. For your project, verify prices, grants, timelines, permissions and expected returns with the relevant authorities, grid operator and installer, and check the applicable contracts.

Some pages also invite you to get in touch or highlight services, and may contain other commercial messages from the site operator.

Calculate the profitability of your installation

Estimate output, avoided purchases and payback using your data. Confirm the assumptions in a quote.

Callback request