GRDDistribution Network Manager

TL;DR

The DSO is your local electricity supplier and low voltage network operator. It manages the connection of your solar installation, the bidirectional meter and the surplus purchase tariff. In French-speaking Switzerland: SIG (GE), Romande Energie (VD/VS), etc.

Definition

The GRD (Distribution Network Manager) is the local operator of the low and medium voltage electricity network. He is responsible for connecting the photovoltaic installations, reading the meter and paying the injection fee.

🏛️

GRD Geneva

SIG

🏛️

GRD Vaud/VS

Romande Energie

⏱️

Connection delay

4–12 weeks

💰

Injection price

CHF 0.07–0.10/kWh

Technical explanation

The grid operator is determined by the network area serving your address. Households and other small consumers using less than 100 MWh per year currently cannot freely choose their electricity supplier; they receive basic supply. Grid operation and electricity supply are distinct functions. Check connection, metering and surplus remuneration for your address.

Swiss context

Main DSOs in French-speaking Switzerland: SIG (Geneva, the entire canton), Romande Energie (Vaud, Valais, Fribourg partially), EWZ partially, Industrial Services of various municipalities. The connection time varies from 4 to 12 weeks depending on the DSO and the workload.

Related terms

Related guides

FAQs — GRD

Should I contact my DSO to install solar panels?+

Yes. The installer generally does this for you: he submits the connection request to the DSO, who sends a technician to install/configure the bidirectional meter before commissioning.

Can the DNO refuse to connect my installation?+

Legally no, unless your installation exceeds the capacities of the local network (rare in residential settings). In practice, the DSO may request technical adaptations (NA protection, meter type).

Sources & method

Check equipment values in the offered model’s datasheet and warranty terms. Confirm grant, permit and connection requirements with the responsible programme, municipality and grid operator.

This content is for information only. For your project, verify prices, grants, timelines, permissions and expected returns with the relevant authorities, grid operator and installer, and check the applicable contracts.

Some pages also invite you to get in touch or highlight services, and may contain other commercial messages from the site operator.

Calculate the profitability of your installation

Estimate output, avoided purchases and payback using your data. Confirm the assumptions in a quote.

Callback request