Technical explanation
The IRR reflects the marginal cost of production on the spot market. It varies depending on the GRD and the years. The RU Pronovo and the TRI are two independent and cumulative mechanisms.
Privacy choice
Google, HubSpot and Reddit are activated after acceptance. Clarity, Meta and Tawk.to can load independently. Details: cookie policy.
TL;DR
Grid feed-in is the delivery of surplus solar electricity to the public grid. Confirm remuneration, guarantees of origin and metering for your address. The statutory acceptance and remuneration obligation is not limited to systems of 100 kWp.
Definition
Network injection refers to the sale of excess photovoltaic electricity to the local DNO, at the injection remuneration tariff (IRR). A two-way counter is required.
VD injection price
≈ CHF 0.082/kWh
GE injection price
≈ CHF 0.085/kWh
vs purchase price
3–4x less
Meter required
Bidirectionnel
The IRR reflects the marginal cost of production on the spot market. It varies depending on the GRD and the years. The RU Pronovo and the TRI are two independent and cumulative mechanisms.
TRI 2026: SIG (GE) ≈ CHF 0.085/kWh, Romande Energie (VD) ≈ CHF 0.082/kWh. Consult the annual tariff annex of your GRD.
Related guides
Systems within the statutory scope benefit from an acceptance and remuneration obligation. 100 kWp is not a general upper limit for that obligation. Ask the grid operator to confirm how your system is classified and which connection conditions apply.
The producer and grid operator can agree on remuneration. If no agreement is reached, statutory fallback rules apply. For 2026, the Swiss Federal Office of Energy refers to the quarterly reference market price and applicable minimum remuneration. Check guarantees of origin separately.
Sources & method
Check equipment values in the offered model’s datasheet and warranty terms. Confirm grant, permit and connection requirements with the responsible programme, municipality and grid operator.
This content is for information only. For your project, verify prices, grants, timelines, permissions and expected returns with the relevant authorities, grid operator and installer, and check the applicable contracts.
Some pages also invite you to get in touch or highlight services, and may contain other commercial messages from the site operator.
Estimate output, avoided purchases and payback using your data. Confirm the assumptions in a quote.
Callback request