Definition · Installation

Network connectionConnection of the PV installation to the electricity network

TL;DR

Plan grid connection with the DSO before installation. The system must meet electrical requirements, inspections and applicable commissioning conditions.

Definition

Grid connection covers applications, electrical design, protection, metering and approvals needed to connect PV to the distribution network.

⏱️

Deadline

According to GRD

🔌

Required

Adapted meter

🛡️

Protection

According to standards

✅

Validated by

GRD + control

Technical explanation

The quote must specify approved capacity, protection, meter, tests and documents. The authorized electrical firm performs its contracted work and checks; the DSO sets network conditions.

Swiss context

Timing and cost depend on address and required work. Confirm schedule with the DSO and project team. Pronovo payment follows its own conditions and a complete application.

Related terms

Related guides

FAQs — Network connection

Who requests connection to the DSO?+

The contract must identify who prepares, submits and follows the application. Check costs, documents and approvals before ordering.

Can we use the panels before official connection?+

Do not commission a grid-connected installation before required checks and DSO approval. Self-consumption or zero-export settings do not remove these obligations.

Sources & method

Check equipment values in the offered model’s datasheet and warranty terms. Confirm grant, permit and connection requirements with the responsible programme, municipality and grid operator.

This content is for information only. For your project, verify prices, grants, timelines, permissions and expected returns with the relevant authorities, grid operator and installer, and check the applicable contracts.

Some pages also invite you to get in touch or highlight services, and may contain other commercial messages from the site operator.

Calculate the profitability of your installation

Estimate output, avoided purchases and payback using your data. Confirm the assumptions in a quote.

Callback request