Your roof: Confignon
For a detached house, check roof condition, shading and electrical capacity before signing. A single owner’s decision still requires a technical roof survey.
In all cases, the useful surface area is almost always less than the gross surface area announced. Skylights, chimneys, setbacks, shading and future maintenance needs must be integrated before talking about final power.
Request a technical site survey before relying on a sales estimate. Include maintenance, insurance and foreseeable replacements in lifetime cost.
Exposure and access: Confignon
Request a survey of nearby shading and the horizon, with monthly generation estimates. Compare options for your building using the same weather data and loss assumptions.
Reserve space and access for inspections and future replacements. Include the constraints identified during the survey in the quotation.
Full cost and grants: Confignon
The displayed scenario uses an indicative installed cost for 8 kWp. A quote must specify equipment, roofing and electrical work, connection, inspections and fees before deducting confirmed grants.
Programmes depend on the municipality and available funds. Obtain written confirmation of amounts, timing, limits and combined support for your address before including them in the budget.
Request the weather assumptions, losses and monthly results behind the stated output. Value surplus using the confirmed export contract, with guarantees of origin accounted for separately.
Output must be assessed for the actual roof, its orientation, shading and condition. Tariffs depend on the grid, product and contract; a cantonal average does not replace your bill.
Building procedures: Confignon
Specify the work assigned to subcontractors and who is responsible for each task. Check how equipment can be accessed and components replaced without damaging the roof covering.
A serious estimate specifies who prepares the announcement, who manages the connection, who follows the administrative back and forth and how any comments are absorbed into the planning.
In Geneva, check Pronovo, the SIG 2026 solar premium and municipal aid before signing. If the timeline is poorly managed, you lose time and sometimes value on helpers.
Use the building’s hourly consumption to size the project. Agree on tests, inspections and documents to be provided at handover.