Your roof: Grandval
For a detached house, check roof condition, shading and electrical capacity before signing. A single owner’s decision still requires a technical roof survey.
In all cases, the useful surface area is almost always less than the gross surface area announced. Skylights, chimneys, setbacks, shading and future maintenance needs must be integrated before talking about final power.
Measure usable roof area with obstacles and required clearances included. Record amounts, deadlines and revision terms in the offer.
Exposure and access: Grandval
Request a survey of nearby shading and the horizon, with monthly generation estimates. Compare options for your building using the same weather data and loss assumptions.
Check the simultaneous consumption used to estimate avoided electricity purchases. Confirm voltages, currents and module compatibility with the selected inverter.
Full cost and grants: Grandval
The displayed scenario uses an indicative installed cost for 8 kWp. A quote must specify equipment, roofing and electrical work, connection, inspections and fees before deducting confirmed grants.
Programmes depend on the municipality and available funds. Obtain written confirmation of amounts, timing, limits and combined support for your address before including them in the budget.
Request a technical site survey before relying on a sales estimate. Request a schedule that accounts for weather, access and team availability.
Output must be assessed for the actual roof, its orientation, shading and condition. Tariffs depend on the grid, product and contract; a cantonal average does not replace your bill.
Building procedures: Grandval
Check building protection and appearance requirements with the relevant authority. Record who installs, inspects and supports each part of the system in the contract.
A serious estimate specifies who prepares the announcement, who manages the connection, who follows the administrative back and forth and how any comments are absorbed into the planning.
In the canton of Bern, photovoltaics are supported via Pronovo; building or municipal aid must be verified separately before signature.
Reserve space and access for inspections and future replacements. Confirm the supporting structure, anchor points and mounting design.