Your roof: Petit-Val
For a detached house, check roof condition, shading and electrical capacity before signing. A single owner’s decision still requires a technical roof survey.
In all cases, the useful surface area is almost always less than the gross surface area announced. Skylights, chimneys, setbacks, shading and future maintenance needs must be integrated before talking about final power.
Reserve space and access for inspections and future replacements. Keep the simulation assumptions so results can be compared after commissioning.
Exposure and access: Petit-Val
Request a survey of nearby shading and the horizon, with monthly generation estimates. Compare options for your building using the same weather data and loss assumptions.
Request the weather assumptions, losses and monthly results behind the stated output. Identify the service contact and stated response times after commissioning.
Full cost and grants: Petit-Val
The displayed scenario uses an indicative installed cost for 8 kWp. A quote must specify equipment, roofing and electrical work, connection, inspections and fees before deducting confirmed grants.
Programmes depend on the municipality and available funds. Obtain written confirmation of amounts, timing, limits and combined support for your address before including them in the budget.
Use the building’s hourly consumption to size the project. Confirm voltages, currents and module compatibility with the selected inverter.
Output must be assessed for the actual roof, its orientation, shading and condition. Tariffs depend on the grid, product and contract; a cantonal average does not replace your bill.
Building procedures: Petit-Val
Simulate generation and available surplus before choosing a battery. Confirm voltages, currents and module compatibility with the selected inverter.
A serious estimate specifies who prepares the announcement, who manages the connection, who follows the administrative back and forth and how any comments are absorbed into the planning.
In the canton of Bern, photovoltaics are supported via Pronovo; building or municipal aid must be verified separately before signature.
Prepare a timetable showing procedures, approvals and work in their actual sequence. Request a schedule that accounts for weather, access and team availability.