Privacy choice

Google, HubSpot and Reddit are activated after acceptance. Clarity, Meta and Tawk.to can load independently. Details: cookie policy.

Saxon • Valais

Solar panels: Saxon, Valais Plan your project 2026

Your solar project: Saxon. Specify access, lifting equipment and protection of the work area. Compare mounting and removal arrangements against the condition of the roof covering. Specify the work assigned to subcontractors and who is responsible for each task. Request a schedule that accounts for weather, access and team availability.

Verify the grid operatorCompare detailed quotesScenario: 8 kWp

Roof potential

To assess

Purchase — calculation hypothesis

CHF 0.260/kWh

Net cost — model

CHF 16'960

Payback — model

10-13 years

The 8 kWp scenario above uses the cantonal model assumptions: indicative output, 40 % self-consumption, hypothetical purchase and export tariffs, installed costs of CHF 2 200 to 2 800/kWp and assumed Pronovo support of CHF 360 to 400/kWp. It is not a local quote. Recalculate using your roof, hourly demand, contracts and confirmed grants; include fees, losses and replacements.

Your roof: Saxon

For a detached house, check roof condition, shading and electrical capacity before signing. A single owner’s decision still requires a technical roof survey.

In all cases, the useful surface area is almost always less than the gross surface area announced. Skylights, chimneys, setbacks, shading and future maintenance needs must be integrated before talking about final power.

Simulate generation and available surplus before choosing a battery. Price the necessary electrical distribution board changes and protection devices.

Exposure and access: Saxon

Request a survey of nearby shading and the horizon, with monthly generation estimates. Compare options for your building using the same weather data and loss assumptions.

Assess shifting compatible loads to solar hours before adding storage. Include maintenance, insurance and foreseeable replacements in lifetime cost.

Full cost and grants: Saxon

The displayed scenario uses an indicative installed cost for 8 kWp. A quote must specify equipment, roofing and electrical work, connection, inspections and fees before deducting confirmed grants.

Programmes depend on the municipality and available funds. Obtain written confirmation of amounts, timing, limits and combined support for your address before including them in the budget.

Specify access, lifting equipment and protection of the work area. Check how equipment can be accessed and components replaced without damaging the roof covering.

Output must be assessed for the actual roof, its orientation, shading and condition. Tariffs depend on the grid, product and contract; a cantonal average does not replace your bill.

Building procedures: Saxon

Reserve space and access for inspections and future replacements. Include the constraints identified during the survey in the quotation.

A serious estimate specifies who prepares the announcement, who manages the connection, who follows the administrative back and forth and how any comments are absorbed into the planning.

In Valais, residential photovoltaics first go through Pronovo; Any municipal aid or other energy measures must be confirmed before signature.

Show chimneys, roof windows and other obstacles on the installation layout. Specify fall protection and access for installation and maintenance.

Compare installers: Saxon

When comparing installers, check the stated production assumptions. Then check the value of exported surplus using cautious assumptions. These details matter more than the advertised price alone.

The quality gaps are quickly seen in the annexes: level of technical inspection, self-consumption assumptions, electrical diagram, service after commissioning and clarity of service limits.

Before choosing an installer, ask who attends the site after a fault, the travel charges and stated response time. A registered office address does not establish service availability for your building.

Define included and excluded work during the technical survey. Agree on tests, inspections and documents to be provided at handover.

Places cited on this page — confirm service coverage

Saxon

Frequently asked questions: Saxon

Prepare these questions about the roof, costs, storage and procedures before comparing offers.

What should I check during the roof survey?

Use the building’s hourly consumption to size the project. Specify fall protection and access for installation and maintenance.

How should I compare self-consumption and exports?

Compare avoided purchase costs and surplus export prices with your hourly demand. Self-consumption reduces purchases when generation is used on site; the choice also depends on full cost and losses.

How should I assess adding a battery?

First compare an option without storage for the same demand. Request plans, equipment references and service boundaries before accepting a price. Keep the simulation assumptions so results can be compared after commissioning.

Which procedures should I confirm for this building?

The procedure depends on the plot, building and integration. Present the plan to the municipality to confirm notification or permit requirements and any protection constraints before ordering.

What should I request from installers?

When comparing installers, check a detailed comparison of each quotation item. Then check compatibility between the modules and inverter. These details matter more than the advertised price alone.

Guides to nearby towns

Prepare your solar project: Saxon

Compare detailed offers, check the construction method and lock in the right order between roofing, quotes and procedures.

Move from information to action

Receive a personalised estimate, compare your options and prepare your solar project with a clear process.

Callback request