Your roof: Sion
Adapt the project to the building’s use, whether a house, apartment building or business premises. Include future vehicle charging or heating changes in the consumption scenario.
In all cases, the useful surface area is almost always less than the gross surface area announced. Skylights, chimneys, setbacks, shading and future maintenance needs must be integrated before talking about final power.
Simulate generation and available surplus before choosing a battery. Keep the simulation assumptions so results can be compared after commissioning.
Exposure and access: Sion
Request a survey of nearby shading and the horizon, with monthly generation estimates. Compare options for your building using the same weather data and loss assumptions.
Assess shifting compatible loads to solar hours before adding storage. Record amounts, deadlines and revision terms in the offer.
Full cost and grants: Sion
The displayed scenario uses an indicative installed cost for 8 kWp. A quote must specify equipment, roofing and electrical work, connection, inspections and fees before deducting confirmed grants.
Programmes depend on the municipality and available funds. Obtain written confirmation of amounts, timing, limits and combined support for your address before including them in the budget.
Specify access, lifting equipment and protection of the work area. Confirm voltages, currents and module compatibility with the selected inverter.
Output must be assessed for the actual roof, its orientation, shading and condition. Tariffs depend on the grid, product and contract; a cantonal average does not replace your bill.
Building procedures: Sion
Reserve space and access for inspections and future replacements. Identify the service contact and stated response times after commissioning.
A serious estimate specifies who prepares the announcement, who manages the connection, who follows the administrative back and forth and how any comments are absorbed into the planning.
In Valais, residential photovoltaics first go through Pronovo; Any municipal aid or other energy measures must be confirmed before signature.
Show chimneys, roof windows and other obstacles on the installation layout. Request a schedule that accounts for weather, access and team availability.