Definition · Finance & ROI

Self-sufficiency rate% of consumption covered by solar

TL;DR

Self-sufficiency measures the share of electricity consumption covered by local generation actually used. It ranges from 0 to 100 %. Annual generation above annual consumption does not prove independence at every hour.

Definition

Self-sufficiency = locally generated energy consumed on site ÷ total consumption × 100, using the same period and boundary. It differs from self-consumption rate, whose denominator is generation.

📊

Range

0–100 %

🏠

Denominator

Total consumption

☀️

Energy in the numerator

Local generation used

⏱️

Sizing

Hourly profile

Technical explanation

Grid purchases remain necessary when local generation and available storage do not meet demand. Exported surplus does not directly increase self-sufficiency. For storage, count local energy actually delivered to loads after losses and distinguish energy charged from the grid. 100 % self-sufficiency requires all demand within the boundary to be covered during the period.

Swiss context

Request a seasonal hourly simulation for your roof and appliances. A home battery shifts consumption by hours; it does not store summer surplus for the whole winter. Compare the cost of additional self-sufficiency with avoided purchases instead of targeting a universal percentage.

Related terms

Related guides

FAQs — Self-sufficiency rate

Can we achieve 100% annual self-sufficiency in Switzerland?+

It depends on location, demand, generation and storage. An annual surplus is insufficient. Check hourly coverage, adverse periods, losses and backup arrangements before calling a project self-sufficient.

What is the difference between self-sufficiency and self-consumption?+

With 9 000 kWh generated, 5 000 kWh consumed and 4 000 kWh of local generation used on site, self-consumption is 4 000 ÷ 9 000, about 44 %, and self-sufficiency is 4 000 ÷ 5 000, or 80 %. Use consistent data for the same period.

Sources & method

Check equipment values in the offered model’s datasheet and warranty terms. Confirm grant, permit and connection requirements with the responsible programme, municipality and grid operator.

This content is for information only. For your project, verify prices, grants, timelines, permissions and expected returns with the relevant authorities, grid operator and installer, and check the applicable contracts.

Some pages also invite you to get in touch or highlight services, and may contain other commercial messages from the site operator.

Calculate the profitability of your installation

Estimate output, avoided purchases and payback using your data. Confirm the assumptions in a quote.

Callback request