Budget & applications October 2026 5 min read

Electricity bills in Vaud: seven mistakes to avoid

Editorial responsibility: Franck Tournier · Report a fix

TL;DR

Two households in Vaud can have different tariffs and needs. Start with your bill and address, then compare potential savings with the cost of the work. A national average or a promised return cannot replace this calculation.

1. Using another supplier’s tariff

Identify the DSO, electricity product and year on your bill. Then find the tariff schedule for your address. Geneva’s SIG conditions are not a tariff for a house in Vaud. Ask for an explanation of any charge missing from the schedule.

2. Confusing prices with consumption

Compare matching dates and kWh. Check actual readings, estimates, advance payments and adjustments. Separate energy, network, metering, levies and VAT. Compare a new metering charge with the total bill rather than assessing it in isolation.

3. Assuming electricity is always cheaper at night

Check your contract’s time bands and prices before rescheduling laundry, hot water or charging. With solar, daytime consumption can avoid a grid purchase. Compare the cost of the same activity across time bands, including fixed charges and household comfort.

4. Replacing heating without an assessment

Request a building assessment, heating-distribution temperatures and an estimate of seasonal consumption. Compare control adjustments, insulation and replacement. An advertised performance coefficient alone cannot guarantee annual savings for your home.

5. Counting a grant before approval

Check the specific measure in Vaud’s Buildings Programme. Confirm whether a GEAK Plus assessment is required and when to apply. Ask the canton what needs approval before ordering or starting work. GEAK Plus adds renovation recommendations to the energy certificate; it does not automatically qualify every appliance for a grant.

6. Valuing all solar generation at the purchase price

Separate electricity used on site from exports. Apply the cost actually avoided to the first and the feed-in contract to the second. Include investment, maintenance and financing. Compare a battery with a version without storage using the same assumptions.

7. Signing without clear responsibilities

Keep bills, readings, quotes and DSO responses in a dated project file. Identify who handles grants, grid connection, inspections and handover. Then compare the forecast measurements and budget with a full year of actual operation.

References for planning your project

Frequently asked questions

Can a national tariff figure calculate my bill?+

Use your local tariff schedule and consumption. A national figure is a benchmark, not a substitute for your contract terms.

Do I need a battery to save money?+

First compare control settings, consumption timing and solar without a battery. The simulation should include installed cost, losses, usable capacity and replacement.

Sources & method

ElCom and Canton of Vaud references checked on 7 October 2026. Confirm the conditions and timetable of the measure that applies to your work.

This content is for information only. For your project, verify prices, grants, timelines, permissions and expected returns with the relevant authorities, grid operator and installer, and check the applicable contracts.

Some pages also invite you to get in touch or highlight services, and may contain other commercial messages from the site operator.

Move from information to action

Receive a personalised estimate, compare your options and prepare your solar project with a clear process.

Callback request