New construction 2026-06-05 8 min read

Solar obligation in new construction: what the project owner must ask for

Editorial responsibility: Franck Tournier · Report a fix

TL;DR

Plan solar with the building envelope, electrical installation and future electricity demand. Have the building data, tariffs, financial support and responsibilities confirmed in your quote.

Plan solar with the building envelope, electrical installation and future electricity demand. Check the site data and official sources before signing.

Decision to make

Plan solar with the building envelope, electrical installation and future electricity demand. Adapt this decision to the building, your actual consumption and the project schedule.

For this project, start by identifying the grid operator, applicable tariff and site constraints. The quotation must specify the conditions affecting connection, metering or the value of surplus electricity.

Practical effects of the project

  • The subject starts from the new project: envelope, electrical panel, connection and future uses must be drawn before submitting the file.
  • For a 2026 building permit, check the federal obligation and applicable cantonal requirements, as well as permitted exceptions for the building.
  • Since 1 January 2025, Article 45a of the Energy Act has provided for the use of solar energy on roofs or façades of new buildings with a qualifying building area exceeding 300 m².
  • The architect must still reserve roof, ducts, technical room, cable trays, meter and space for heat pump, terminal or battery.
  • Cantonal or municipal rules may impose or specify solar installation; they must be verified before submitting the permit.
  • The client must require coordination between energy planning, statics, waterproofing, fire and network connection.

These points help assess the topic ‘ Solar obligation in new construction: what the project owner must ask for ’ without turning a national average into a local promise. Every decisive figure needs its source, date and scope.

Specific controls

  • Cantonal or municipal law 2026, permit authority, possible exceptions, electrical reservations and connection.

The answers should appear in the quote or in a dated appendix. A verbal explanation is insufficient if it changes the price, expected output, financial support or a contractual obligation.

Compare quotes

  • Tariffs: state the purchase price, surplus remuneration and fixed charges applicable to the site, with their source and date.
  • Production: provide a monthly estimate with orientation, shading, losses and weather assumptions.
  • Investment: separate material, installation, safety, scaffolding, connection, procedures and options.
  • Aids: distinguish confirmed amount, estimate and deposit liability.
  • Contract: specify guarantees, calendar, deposit, exclusions, maintenance and after-sales service.

Plan solar with the building envelope, electrical installation and future electricity demand. In the comparison table, keep one column for the stated value, one for the evidence provided, and one for the effect of a less favorable hypothesis.

Cautious scenario

Test the project with slightly lower production, an unconfirmed grant and less favourable surplus remuneration. This scenario shows whether the decision remains sound based on self-consumption, roof quality and a controlled installed cost.

The main references used are SFOE - support for photovoltaic installations, Confederation - Sonnendach / solar potential of roofs, OFEN/BFE - Connection conditions and remuneration 2026, Fedlex - Energy Law, art. 45a and cantonal verification. They frame the method, but the local amounts and contractual conditions must be rechecked at the time the offer is signed.

Risks to be managed

Cantonal or municipal rules may impose or specify solar installation; they must be verified before submitting the permit. Ask who assumes this risk, what proof will be provided and how a change is handled after ordering.

A more expensive solution should meet a specific need in your project. Ask for a documented benefit and a separate price for each option.

Next step

Gather the address, annual consumption, future electricity uses and building documents. Then check the grid operator's conditions, available grants and site constraints; request quotations covering the same scope.

Plan solar with the building envelope, electrical installation and future electricity demand. You can then decide with a documented net price, clear responsibilities and assumptions that each company can explain line by line.

Points to check

  • Tariffs: Compare the tariff for your address with the Swiss ElCom median for 2026, keeping local prices separate from the national benchmark.
  • Grants: Check the programme, eligibility, documents and deadlines with Pronovo, the canton or municipality. Include only confirmed contributions in your budget.
  • Roof potential: Sonnendach is presented as a public pre-diagnosis, to be validated by a technical visit.
  • ROI: the method separates self-consumption, injection, installed price, taxation and payment schedule.
  • The subject starts from the new project: envelope, electrical panel, connection and future uses must be drawn before submitting the file.
  • For a 2026 building permit, check the federal obligation and applicable cantonal requirements, as well as permitted exceptions for the building.

Sources

Frequently asked questions

Which technical or contractual control has priority?+

Cantonal or municipal law 2026, permit authority, possible exceptions, electrical reservations and connection.

Which quotation details should I confirm before signing?+

Plan solar with the building envelope, electrical installation and future electricity demand. For this project, ask for the value used, its date and its source, then have the applicable tariff confirmed by the responsible grid operator.

How to compare the offers received?+

A suitable quote separates the base price, options, grid connection and confirmed financial support. It also shows the effect on self-consumption and surplus electricity.

When should you recheck rates and assistance?+

Recheck tariffs, grants, equipment availability and network requirements before ordering and again before commissioning if the project takes a long time.

Sources & method

References and verification dates: SFOE - support for photovoltaic installations ; Confederation - Sonnendach / solar potential of roofs ; OFEN/BFE - Connection conditions and remuneration 2026 ; Fedlex - Energy Law, art. 45a and cantonal verification ; ElCom - Slight drop in electricity prices in 2026 ; Pronovo - Submit a photovoltaic subsidy application ; Swissolar - Swiss Solar Monitor ; Energiefranken - Search for energy aid by municipality. Local amounts, feed-in tariffs and municipal aid must be confirmed at the time of the quote, as they depend on the municipality, the network manager and the program still available.

This content is for information only. For your project, verify prices, grants, timelines, permissions and expected returns with the relevant authorities, grid operator and installer, and check the applicable contracts.

Some pages also invite you to get in touch or highlight services, and may contain other commercial messages from the site operator.

Move from information to action

Receive a personalised estimate, compare your options and prepare your solar project with a clear process.

Callback request