Solar panels in Switzerland: understand capacity, generation and installed cost

Editorial responsibility: Franck Tournier · Report a fix

TL;DR

When choosing a system, distinguish panel capacity, generated energy and electricity bought from the grid. These values answer different questions. Request a documented proposal for your roof and use, then compare price, procedures and service for the same scope.

Gallery

Other images: scroll horizontally →

1. Read kWp, kW and kWh

kWp describes rated module capacity under reference conditions. kW measures power at an instant; kWh measures energy over a period. Do not compare kWp capacity with annual consumption without a generation calculation. Chosen arithmetic example: twenty 400 Wp modules total 8 kWp; this does not yet establish your roof’s kWh output.

2. Request site-specific generation

Document orientation, tilt, weather data, shading, snow, availability and assumed losses. Request monthly results and their limitations. Cell efficiency, rated capacity and annual energy are not interchangeable. A technology or brand does not guarantee identical gains on every roof; compare exact models in the same calculation.

3. Compare generation and hourly demand

Record consumption, occupancy, hot water, heating and current or planned charging. Separate direct use, battery charging, surplus and grid purchases. Producing as many kWh as annual consumption does not necessarily cover every hour or winter. Use the same profiles for storage and no-storage options.

4. Read the complete-system price

Request equipment, mounting, access, roof work, electrical work, connection, testing and VAT. Separate options and excluded work. CHF/kWp is comparable only when capacity and included services are consistent. Ask for a schedule, payment terms and how construction changes are handled. The itemised quote remains the basis of the building’s budget.

5. Check grants and procedures separately

Identify the Pronovo programme, local conditions and documents required for the system. Specify responsibility, filing date, plant certification and follow-up. Clarify building notification or permission and grid technical approval for the site. Grants, building permissions and electrical authorisations follow different procedures; a voluntary label does not replace them.

6. Prepare handover and operation

Keep the layout, serial numbers, tests, documented settings and warranties. Specify data access, alerts, maintenance and fault contacts. Product, power and installation warranties have different terms. Compare model terms and uncovered charges; do not infer actual service life from a warranty expiry date alone.

References for planning your project

Frequently asked questions

Does module efficiency alone determine generation?+

It informs equipment selection. Generation also depends on the site, mounting, losses and system availability.

Do more panels always mean greater savings?+

Compare additional cost, usable generation, surplus and the contract. Higher installed capacity alone does not establish a better financial return.

Sources & method

References checked on 7 and 8 October 2026. Have site data, equipment and procedures verified by the project professionals.

This content is for information only. For your project, verify prices, grants, timelines, permissions and expected returns with the relevant authorities, grid operator and installer, and check the applicable contracts.

Some pages also invite you to get in touch or highlight services, and may contain other commercial messages from the site operator.

Move from information to action

Receive a personalised estimate, compare your options and prepare your solar project with a clear process.

Callback request