TL;DR

In 2026, the reliable basis is the Pronovo PRU calculated with the official tariff calculator. Cantonal or municipal aid only exists if your project meets an official program; they must be verified before being included in the budget.

Cautious overview of the aid available in 2026: Federal Pronovo, targeted local aid and taxation, without an invented cantonal package.

The Swiss photovoltaic support system is useful, but you have to distinguish between what is federal, local and really guaranteed for your project.

The Single Payment (RU) Pronovo. This is the basis: federal aid paid after commissioning for typical small photovoltaic installations of less than 100 kWp. For 8 kWp, use the official rater according to the applicable scale and configuration. Prepare the information from the quote, but do not confuse PRONOVO with cantonal aid.

Cantonal or local aid. They are not automatic. Geneva has a SIG 2026 Solar Prime under conditions. Neuchâtel targets in particular domestic batteries and large PV roofs. Vaud, Fribourg, Valais, Bern and Jura mainly refer the standard PV to Pronovo or to separate building programs. Municipalities can add aid, but it must be confirmed municipality by municipality.

Tax deduction. Energy investments can be deductible according to cantonal and municipal rules. The effect depends on your taxable income, the type of building and the tax treatment of the assistance received.

Buyer Strategy. Budget Pronovo first, then add only local aid confirmed by an official source or written response. Ask the quote to separate guaranteed amounts, probable amounts and assumptions.

Frequently asked questions

Can we combine Pronovo with cantonal or municipal aid?+

Yes when the local program allows it, but the aid must exist for your specific project. Good practice is to check Pronovo, canton, municipality and taxation separately before signing.

When is the Pronovo request made?+

For typical small PV installations of less than 100 kWp, the PRU request is filed after commissioning. Large facilities and local aids may follow other schedules; check the exact case before signing.

Sources & method

This content is for information only. For your project, verify prices, grants, timelines, permissions and expected returns with the relevant authorities, grid operator and installer, and check the applicable contracts.

Some pages also invite you to get in touch or highlight services, and may contain other commercial messages from the site operator.

Move from information to action

Receive a personalised estimate, compare your options and prepare your solar project with a clear process.

Callback request