TL;DR

A larger installation is not necessarily a mistake. In Switzerland, the right choice depends on the available roof space, future electrical uses, the targeted self-consumption rate and the real value of the kWh injected.

Good sizing looks at the future, not just the current bill

An installation may seem too large today while remaining perfectly logical if a heat pump, a charging station or a battery are coming soon. Conversely, a project that is too tight can become limiting very quickly.

The 4-step method

01

Project consumption for the next few years

Add the likely uses of the home: terminal, heat pump, piloted balloon, more frequent teleworking. An installation is not made just for the photo of the moment.

02

Measure the marginal cost of additional panels

On a construction site already underway, additional panels often cost less than the core of the project. It is this marginal cost that must be compared to the future value of production.

03

Compare self-consumption and future injection

A larger installation will inject more if nothing changes in the home. But if you can electrify or control more uses, this margin becomes much more useful.

04

Decide according to the building strategy

If you are building a base for the next ten years, planning a little bigger may be rational. If you only want to cover the existing as closely as possible, you have to stay tighter.

Frequently asked questions

Does oversizing necessarily lower profitability?+

Not necessarily. It depends on the marginal cost of the additional panels, the level of injection into the network and the electrical uses that you will then add.

Should the entire available roof be filled?+

No. The available surface area is a useful constraint, but the decision must above all follow the economic and energy logic of the building.

Sources & method

Swissolar; SuisseEnergie; residential sizing practices in Switzerland.

This content is for information only. For your project, verify prices, grants, timelines, permissions and expected returns with the relevant authorities, grid operator and installer, and check the applicable contracts.

Some pages also invite you to get in touch or highlight services, and may contain other commercial messages from the site operator.

Move from information to action

Receive a personalised estimate, compare your options and prepare your solar project with a clear process.

Callback request