All videos
How do you measure surplus solar by time interval?
What to check
Match production and export data over the same intervals. An offset between them can distort the result.
- Export the meter readings. Download the interval data you can access.
- Align the timestamps. Check the interval length and time zone.
- Separate imports and exports. Identify the direction and unit of each column.
- Pick a recurring window. Look for times when you repeatedly export.
