Privacy choice

Google, HubSpot and Reddit are activated after acceptance. Clarity, Meta and Tawk.to can load independently. Details: cookie policy.

Definition · Unit & Measurement

kWhKilowatt hour — unit of electrical energy

TL;DR

The kWh (kilowatt hour) is the unit of energy used to measure solar production and electricity consumption. 1 kWh = 1 000 W for 1 hour. Do not confuse with kWp (peak power). Your electricity bill is in kWh.

Definition

The kilowatt hour (kWh) is the unit of electrical energy. This is the energy produced or consumed by a 1 000 watt (1 kW) device for 1 hour. Distinct from kWp (peak power): kWh measures energy, kWp power.

🏠

Cons. average household

4 500–6 000 kWh/year

🌡️

With PAC

+3 000–5 000 kWh/year

🚗

With EV (20 000 km)

+3 000–4 000 kWh/year

💰

Average price CH

CHF 0.22–0.28/kWh

Technical explanation

Fundamental relationship: Energy (kWh) = Power (kW) × Time (h). A 400 Wp (0.4 kW) panel for 5 hours of peak sunshine produces 0.4 × 5 = 2 kWh. Please note: 5 hours of peak sun hours (5 'peak sun hours') ≠ 5 hours of sun — this is a standardized concept which integrates the variable intensity of radiation over the day.

Swiss context

Average Swiss electricity consumption: 4 500–6 000 kWh/year per household of 4 people (excluding electric heating or EV). With heat pump: +3 000–5 000 kWh/year. With EV (20 000 km/year): +3 000–4 000 kWh/year. Average Swiss tariff: CHF 0.22–0.28/kWh all inclusive.

Related terms

Related guides

FAQs — kWh

What is the difference between kWh and kWp?+

kWp = kilowatt-peak = unit of POWER (like the horsepower of an engine). kWh = kilowatt hour = unit of ENERGY (like liters of gasoline consumed). 1 kWp produces approximately 1 000–1 400 kWh per year in French-speaking Switzerland.

How many kWh does a 8 kWp installation produce in Switzerland?+

Between 8 000 kWh/year (Jura) and 11 200 kWh/year (Valais due south). The median in French-speaking Switzerland (Vaud, Geneva) is around 8 800–9 600 kWh/year for a south-facing orientation at 35° inclination.

Sources & method

Check equipment values in the offered model’s datasheet and warranty terms. Confirm grant, permit and connection requirements with the responsible programme, municipality and grid operator.

This content is for information only. For your project, verify prices, grants, timelines, permissions and expected returns with the relevant authorities, grid operator and installer, and check the applicable contracts.

Some pages also invite you to get in touch or highlight services, and may contain other commercial messages from the site operator.

Calculate the profitability of your installation

Estimate output, avoided purchases and payback using your data. Confirm the assumptions in a quote.

Callback request