Definition · Technology

Photovoltaic module efficiency% of solar energy converted to electricity

TL;DR

The efficiency of a panel = % of the solar energy received converted into electricity. Current range: 20–23% for commercial TOPCon/HJT modules. The efficiency determines the roof area needed: the higher the efficiency, the less m² of roof you need.

Definition

The efficiency of a photovoltaic module is the ratio between the electrical power produced and the light power received by the surface of the module, expressed as a percentage. Measured in STC conditions (1 000 W/m², 25°C, AM 1.5).

⚡

TOPCon 2026

21.5–22.5%

⚡

HJT 2026

21.8–23.2%

📉

PERC (old)

20–21%

🔬

Laboratory record

29.1% (perovskite)

Technical explanation

Efficiency = Power (W) / (Irradiance (W/m²) × Surface (m²)). A 440 Wp module measuring 1.75 m² under 1 000 W/m² has an efficiency = 440 / (1 000 × 1.75) = 25.1% — laboratory value. In real conditions, the effective efficiency is reduced by temperature, variable irradiance and system losses: 18–21% in practice. Do not confuse module efficiency and PR (performance ratio) of the installation.

Swiss context

Evolution of commercial module yield in Switzerland: 2015: 17–18% (PERC), 2020: 19–20% (improved PERC), 2023: 21–22% (TOPCon), 2026: 21.5–23.2% (TOPCon/HJT). The gain in efficiency allows more power to be installed on the same roof surface.

Related terms

Related guides

FAQs — Photovoltaic module efficiency

Does the performance of a panel decrease with age?+

Yes slightly. The annual degradation of 0.35–0.45% for N-Type means that after 25 years, the efficiency is at 90–91% of its initial value — eg: a panel at 22% initial will be at ~20% after 25 years.

Is higher yield always better?+

If roof area is limited, yes — each additional % efficiency = more watts on the same area. If the surface area is large, performance is secondary to value for money and durability.

Sources & method

Check equipment values in the offered model’s datasheet and warranty terms. Confirm grant, permit and connection requirements with the responsible programme, municipality and grid operator.

This content is for information only. For your project, verify prices, grants, timelines, permissions and expected returns with the relevant authorities, grid operator and installer, and check the applicable contracts.

Some pages also invite you to get in touch or highlight services, and may contain other commercial messages from the site operator.

Calculate the profitability of your installation

Estimate output, avoided purchases and payback using your data. Confirm the assumptions in a quote.

Callback request