Privacy choice

Google, HubSpot and Reddit are activated after acceptance. Clarity, Meta and Tawk.to can load independently. Details: cookie policy.

Definition · Technology

TOPConTunnel Oxide Passivated Contact

TL;DR

TOPCon denotes tunnel-oxide passivated contacts. The architecture does not guarantee the same efficiency, price or operating life for every module.

Definition

TOPCon stands for Tunnel Oxide Passivated Contact. A very thin oxide layer and doped silicon form a selective contact that reduces recombination losses.

⚡

Power

Per datasheet

🌡️

Temperature

Model coefficient

📉

Degradation

Read warranty

💰

Cost

Full quote

Technical explanation

TOPCon describes the contact, not the substrate doping type. Both N-type and P-type TOPCon cells exist. Check efficiency, temperature coefficient and warranty for the offered model.

Swiss context

Compare required area, simulated output, installed price and Swiss service. LONGi Hi-MO X6 uses HPBC; a brand name does not classify all its ranges as TOPCon.

Related terms

Related guides

FAQs — TOPCon

Is TOPCon better than HJT?+

Compare exact models with a roof simulation. Weigh any premium against expected gains and warranties; the TOPCon or HJT label is insufficient.

What is the lifespan of a TOPCon panel?+

It depends on the product and operation. Distinguish product warranty, power warranty and operating life; a contractual degradation limit does not precisely predict future output.

Are TOPCon panels Pronovo eligible in Switzerland?+

TOPCon technology in itself is not the criterion. Check the exact reference of the module, its certificates and the documents requested for the Pronovo file at the time of the quote.

Sources & method

Check equipment values in the offered model’s datasheet and warranty terms. Confirm grant, permit and connection requirements with the responsible programme, municipality and grid operator.

This content is for information only. For your project, verify prices, grants, timelines, permissions and expected returns with the relevant authorities, grid operator and installer, and check the applicable contracts.

Some pages also invite you to get in touch or highlight services, and may contain other commercial messages from the site operator.

Calculate the profitability of your installation

Estimate output, avoided purchases and payback using your data. Confirm the assumptions in a quote.

Callback request