Prices & Battery 2026-08-17 8 min read

Battery or solar injection in 2027: compare four consumption profiles

Editorial responsibility: Franck Tournier · Report a fix

TL;DR

Compare the same electricity production across direct use, battery storage and export, including local tariff risks. Have the building data, tariffs, financial support and responsibilities confirmed in your quote.

Compare the same electricity production across direct use, battery storage and export, including local tariff risks. Check the site data and official sources before signing.

Swiss farm with solar roof, domestic battery and electricity grid pole in the background
Illustration: on-site storage and injection respond to different consumption profiles.
Solar battery and connection cabinet visible in a Swiss house opening onto the Alps
System details: self-consumption, storage and injection can be read in the real installation.

Decision to make

Compare the same electricity production across direct use, battery storage and export, including local tariff risks. Adapt this decision to the building, your actual consumption and the project schedule.

For this project, start by identifying the grid operator, applicable tariff and site constraints. The quotation must specify the conditions affecting connection, metering or the value of surplus electricity.

Practical effects of the project

  • The recovery framework from 2027 must be read as a dated hypothesis: the tariff, the DNO contract and the rule applicable to your installation must appear separately.
  • The first profile is the household present during the day: self-consumption can already valorize a large part of solar energy without batteries.
  • The second is the household absent during the day but active in the evening: a battery can displace part of the production, with losses and replacement costs.
  • The third adds a heat pump, boiler or controllable terminal: moving a load can be simpler and cheaper than storing each kWh.
  • The fourth produces a lot of surplus: it must test decline in recovery, hourly spot price, injection limitation and contractual risk instead of promising an annuity.

These points help assess the topic ‘ Battery or solar injection in 2027: compare four consumption profiles ’ without turning a national average into a local promise. Every decisive figure needs its source, date and scope.

Specific controls

  • Year and source of each 2027 hypothesis in the simulation.
  • Comparison of direct self-consumption, battery, injection and capping.
  • Purchase and recovery price of the DSO identified for the address, with duration and conditions of the contract.
  • Sensitivity to a less favorable trade-in price and a battery replaced during the duration of the project.

The answers should appear in the quote or in a dated appendix. A verbal explanation is insufficient if it changes the price, expected output, financial support or a contractual obligation.

Compare quotes

  • Tariffs: state the purchase price, surplus remuneration and fixed charges applicable to the site, with their source and date.
  • Production: provide a monthly estimate with orientation, shading, losses and weather assumptions.
  • Investment: separate material, installation, safety, scaffolding, connection, procedures and options.
  • Aids: distinguish confirmed amount, estimate and deposit liability.
  • Contract: specify guarantees, calendar, deposit, exclusions, maintenance and after-sales service.

Compare the same electricity production across direct use, battery storage and export, including local tariff risks. In the comparison table, keep one column for the stated value, one for the evidence provided, and one for the effect of a less favorable hypothesis.

Cautious scenario

Test the project with slightly lower production, an unconfirmed grant and less favourable surplus remuneration. This scenario shows whether the decision remains sound based on self-consumption, roof quality and a controlled installed cost.

The main references used are Federal Council - Payment for taking back solar electricity from 2027, Swissolar - New remuneration model and hourly spot price, OFEN/BFE - Connection conditions and remuneration 2026, Swissolar/VSE - Local solar power models 2026. They frame the method, but the local amounts and contractual conditions must be rechecked at the time the offer is signed.

Risks to be managed

The fourth produces a lot of surplus: it must test decline in recovery, hourly spot price, injection limitation and contractual risk instead of promising an annuity. Ask who assumes this risk, what proof will be provided and how a change is handled after ordering.

A more expensive solution should meet a specific need in your project. Ask for a documented benefit and a separate price for each option.

Next step

Gather the address, annual consumption, future electricity uses and building documents. Then check the grid operator's conditions, available grants and site constraints; request quotations covering the same scope.

Compare the same electricity production across direct use, battery storage and export, including local tariff risks. You can then decide with a documented net price, clear responsibilities and assumptions that each company can explain line by line.

Points to check

  • Tariffs: Compare the tariff for your address with the Swiss ElCom median for 2026, keeping local prices separate from the national benchmark.
  • Grants: Check the programme, eligibility, documents and deadlines with Pronovo, the canton or municipality. Include only confirmed contributions in your budget.
  • Roof potential: Sonnendach is presented as a public pre-diagnosis, to be validated by a technical visit.
  • ROI: the method separates self-consumption, injection, installed price, taxation and payment schedule.
  • The recovery framework from 2027 must be read as a dated hypothesis: the tariff, the DNO contract and the rule applicable to your installation must appear separately.
  • The first profile is the household present during the day: self-consumption can already valorize a large part of solar energy without batteries.

Sources

Frequently asked questions

Which consumption profile benefits the most from a battery?+

A household that produces at midday but consumes mainly in the evening can shift part of its kWh, provided that the capacity, power and cost are consistent. A household present during the day or capable of controlling a terminal, a boiler or a heat pump can sometimes increase self-consumption without a battery.

What 2027 hypotheses should be dated in a simulation?+

Date the rule used, the source, the purchase price, the recovery price, the duration of the contract, the injection limits and the treatment of a possible spot price. A simulation should not present a future rule as a local guarantee.

Should we choose a battery rather than shifting consumption?+

Not systematically. First compare direct self-consumption, load management, battery and injection. The right choice depends on the time profile, losses, investment and the value that the DSO places on the surplus.

What local rate should you ask the network manager?+

Ask for the purchase price, take-back rule, contract conditions, possible costs and measurement methods for the project address. The name of the manager and the validity date must appear in the offer.

Sources & method

References and verification dates: Federal Council - Payment for taking back solar electricity from 2027 ; Swissolar - New remuneration model and hourly spot price ; OFEN/BFE - Connection conditions and remuneration 2026 ; Swissolar/VSE - Local solar power models 2026 ; ElCom - Slight drop in electricity prices in 2026 ; SFOE - support for photovoltaic installations ; Pronovo - Submit a photovoltaic subsidy application ; Swissolar - Swiss Solar Monitor ; Confederation - Sonnendach / solar potential of roofs ; Energiefranken - Search for energy aid by municipality. Local amounts, feed-in tariffs and municipal aid must be confirmed at the time of the quote, as they depend on the municipality, the network manager and the program still available.

This content is for information only. For your project, verify prices, grants, timelines, permissions and expected returns with the relevant authorities, grid operator and installer, and check the applicable contracts.

Some pages also invite you to get in touch or highlight services, and may contain other commercial messages from the site operator.

Move from information to action

Receive a personalised estimate, compare your options and prepare your solar project with a clear process.

Callback request