Solar remuneration 2027: what changes the hourly spot price

Editorial responsibility: Franck Tournier · Report a fix

TL;DR

From January 1, 2027, the legal remuneration model can be based on the market price at the time of injection if the DSO and the producer do not agree on another price. This guide shows the elements to check in the quote and contract.

What this changes for your decision

From January 1, 2027, the legal remuneration model can be based on the market price at the time of injection if the DSO and the producer do not agree on another price. This guide shows the elements to check in the quote and contract.

For your project, the item “hourly spot price” should be explained in terms of the building, consumption, grid connection and contract. Ask for the source, date and, for calculated values, the method used.

For your project: Check how your contract pays for exports and when its terms change. Compare use, sales and storage with hourly data.

Three checks before signing

1. Local rate

Use the purchase and feed-in tariff published by your network manager, with its validity date.

2. Consumption profile

Separate daily consumption, surplus and controllable uses before assessing profitability.

3. Contractual variant

Request a second, careful calculation in the event of changes in rates or remuneration.

References for “Electricity exports” for your project

Note the date of consultation and the scope of each source. National information does not replace or local rate or technical validation of your project.

Compare quotes on a solid basis

Ask for a reference variant and a conservative variant. Each must separate investment, self-consumption, injection, aid, schedule and responsibilities. You will see if the result holds with a less favorable hypothesis.

For the item “hourly spot price”, the quote should state the data to confirm before work starts, who will check it and how changes will be handled.

Your next step

Prepare utility bill, roof information, existing contracts and comparable quotes. Answer in writing to open questions, then compare net price, annual profit and contractual consequences.

Frequently asked questions

How should you check the item “hourly spot price” before deciding?+

From January 1, 2027, the legal remuneration model can be based on the market price at the time of injection if the DSO and the producer do not agree on another price. This guide shows the elements to check in the quote and contract. The period of application, the conditions of the network operator and the assumptions of the estimate must be explicit.

Which references should you consult on the topic “Electricity exports” for this project?+

From January 1, 2027, the legal remuneration model can be based on the market price at the time of injection if the DSO and the producer do not agree on another price. Also check the current information from your municipality, canton or network operator when it applies to the project.

What data should appear in the quote?+

For the item “hourly spot price”, ask for the assumptions, source and date. The quote should also separate self-consumption, electricity exports, financial support, schedule and responsibilities.

What documents should you prepare before comparing?+

Bring together electricity bill, load profile, roof information, existing contracts and quote variations. Add recent confirmations from the network manager and aid agencies.

Sources & method

Sources 2026/2027: Federal Council, recovery remuneration 2027; Swissolar, new model of retribution.

This content is for information only. For your project, verify prices, grants, timelines, permissions and expected returns with the relevant authorities, grid operator and installer, and check the applicable contracts.

Some pages also invite you to get in touch or highlight services, and may contain other commercial messages from the site operator.

Move from information to action

Receive a personalised estimate, compare your options and prepare your solar project with a clear process.

Callback request