Privacy choice

Google, HubSpot and Reddit are activated after acceptance. Clarity, Meta and Tawk.to can load independently. Details: cookie policy.

Practical guide 2026-02-27 6 min read

How to choose your solar installer in Switzerland: 7 essential criteria

Editorial responsibility: Franck Tournier · Report a fix

TL;DR

A good solar installer must have the necessary electrical authorizations, ideally be trained or referenced by Swissolar, and clarify who manages the Pronovo file, and have verifiable references in your canton. Be wary of unusually low prices — quality labor comes at a cost.

The 7 criteria for choosing the right solar installer in Switzerland. Approvals, certifications, customer reviews, warranties — everything you need to check.

Choosing the right installer is as important as choosing the right panels. Poor wiring, orientation, or inverter configuration can cost 10-20% of production over 25 years.

Criterion 1: Electrical authorization. Non-negotiable. Electrical connections must be made by a company or subcontractor with the necessary authorizations. Ask who signs off on the OIBT work, who controls the installation and where those responsibilities are written in the quote.

Criterion 2: Clear Pronovo file. Pronovo does not certify installers like a commercial label. Instead, check who files the file, with what power of attorney, what documents are included and what follow-up is planned until payment.

Criterion 3: Swissolar certification. Not obligatory but a guarantee of specific skills in photovoltaics. Look for the Swissolar logo on the installer's website. Swissolar training covers technical, regulatory and safety aspects specific to PV.

Criterion 4: Verifiable local references. Ask for 3 customer references in your canton or region, established at least 2 years ago. Call these customers and ask: Is production as expected? Is the after-sales service responsive?

Criterion 5: PVsyst simulation provided. A serious installer gives you a PVsyst simulation (or equivalent) of your installation with the expected PR, annual production per month, and detailed losses. Without detailed simulation, production promises are only rough estimates.

Criterion 6: Clear guarantees. Check: ten-year guarantee on installation (legal in Switzerland), after-sales service guarantee on the inverter and battery, response time in the event of a breakdown. An installer who disappears after installation will leave you alone with the problems.

Criterion 7: Reasonable price. A quote 20% lower than the market should arouse suspicion: lower quality panels? Unlicensed labor? Undersizing of the installation? Compare 3 quotes and question significant discrepancies.

Frequently asked questions

Can an installer charge me for a quote?+

Some charge for the prior technical visit (CHF 100-200), refundable if contract signed. Quotes without a sound visit are generally free. For a complex installation, a paid technical visit is a sign of seriousness — the installer takes the time to correctly assess your situation.

What should I do if my installer goes bankrupt after installation?+

The Pronovo file concerns the installation, but the administrative follow-up must be recoverable with access and complete documents. For manufacturer warranties, check the certificates and invoices. For the installation guarantee, ask an authorized company to evaluate the rework.

Sources & method

This content is for information only. For your project, verify prices, grants, timelines, permissions and expected returns with the relevant authorities, grid operator and installer, and check the applicable contracts.

Some pages also invite you to get in touch or highlight services, and may contain other commercial messages from the site operator.

Move from information to action

Receive a personalised estimate, compare your options and prepare your solar project with a clear process.

Callback request