Privacy choice

Google, HubSpot and Reddit are activated after acceptance. Clarity, Meta and Tawk.to can load independently. Details: cookie policy.

Quotations & contractors 2026-10-08 5 min read

Choose a solar installer in Bern

Editorial responsibility: Franck Tournier · Report a fix

TL;DR

In Bern, compare contractors using your roof, consumption and project scope. Check authorisations, professional status and written service terms instead of a general ranking.

In Bern, compare contractors using your roof, consumption and project scope. Check authorisations, professional status and written service terms instead of a general ranking.

Check the contractors Request the legal company name, comparable references and the division of work between the main contractor and subcontractors. Check authorisation for the electrical tasks. Swissolar membership and the Solarprofis label are different: verify status and activities in the current directory. Nearby premises guarantee neither competence nor repair response times.

Compare the same project Provide roof details, consumption and required functions. Compare models, layout, monthly generation, included work, exclusions and installed price. A generation forecast is not a contractual guarantee. Specify service costs, warranties and contacts. Request several suitable offers without treating three quotations as a legal requirement.

Define procedures and handover Identify the grid operator for the address and who handles each application. Pronovo provides project-specific procedures and permits third-party representation; check documents and timing. Specify payments, tests, handover records and service in the contract. A supplier name or “all-inclusive” claim cannot allocate every responsibility.

Bern example: clarify documents in different languages Consider a buyer receiving a quote in one language and data sheets or warranties in another. This can occur in several regions and does not describe every Bern contract. Request a version you understand and identify documents included in the agreement.

Match device names, model numbers and accessories across quote, specifications and warranty. Translating a commercial name does not establish the same version. Have available functions explained for the Swiss configuration: monitoring, storage, charging and any backup.

Check service and claim contacts separately. Who responds in the agreed language? Who translates a technical requirement or forwards evidence to the manufacturer? Request stated timing and charges without treating a sales conversation as an unlimited service commitment.

Prepare a shared handover list of devices, tests, access and records. Record differences between options before signing. The owner operating the system must understand the choice; a large file does not establish consistency between versions, responsibilities and terms.

Sources

Frequently asked questions

How should I check a contractor before ordering?+

Check the contracting company, contractor authorisations, references, warranties and service terms. Membership does not replace every check.

Is the nearest contractor always the best choice?+

Compare skills, travel, availability and contractual response for your address. Distance alone does not determine service.

Sources & method

Swissolar, SFOE and Pronovo references checked on 8 October 2026. Verify contractor status and building procedures before committing.

This content is for information only. For your project, verify prices, grants, timelines, permissions and expected returns with the relevant authorities, grid operator and installer, and check the applicable contracts.

Some pages also invite you to get in touch or highlight services, and may contain other commercial messages from the site operator.

Move from information to action

Receive a personalised estimate, compare your options and prepare your solar project with a clear process.

Callback request