SMEs & storage October 2026 5 min read

Peak shaving for Swiss SMEs: check tariffs, load profiles and battery capacity

Editorial responsibility: Franck Tournier · Report a fix

TL;DR

A battery can reduce grid demand during some peaks. Savings depend on the billed tariff, peak duration, available energy and system power. Start with a load profile and a full calculation rather than assuming every peak will disappear.

1. Check what the tariff measures

Separate energy in kWh, billed power in kW, network use, metering and taxes. Ask the DSO how the measurement interval, billing period and any minimum charges are defined. A CHF/kW charge is not automatically a tax, and rules can differ between products. Reducing a peak has financial value only if it actually reduces the billed basis.

2. Size power and energy separately

Analyse measurements from a representative period covering seasons, machine starts and EV charging. Inverter power limits instantaneous support; usable capacity and state of charge limit its duration. Simulate successive peaks, a partly charged battery and changes in production. Software cannot guarantee that a sufficient reserve will always be available.

Illustrative example: calculate gross savings

Assume billed demand falls from 450 kW to 250 kW under a hypothetical tariff of CHF 12/kW per month. The difference is 200 kW, or CHF 2 400 per month and CHF 28 800 for twelve identical months. Supplying 200 kW for thirty minutes requires 100 kWh at the output, before losses and reserves are accounted for. This is neither a universal Swiss tariff nor a guaranteed annual saving.

3. Compare costs and competing uses

Include equipment, connection, protective devices, software, subscriptions, maintenance, losses, finance and replacement. Solar energy used for charging has an opportunity cost: it could serve another load or be sold. Backup and tariff arbitrage can consume the reserve intended for peaks. Aggregator revenue depends on eligibility, contract and market conditions; do not count multiple revenues from capacity that is unavailable for those services.

4. Prepare installation and handover

Have location, structure, access, ventilation, noise, fire safety and electrical design assessed. A tenant business must clarify landlord approval and required permissions; a removable battery does not remove those requirements. Check the model’s warranties and maintenance responsibilities. Request handover tests and measurements that allow actual performance to be compared with the simulation.

References for planning your project

Frequently asked questions

Can an empty battery still shave a peak?+

Its support is limited by available energy and system limits. Simulate this situation; a software command cannot create missing energy.

Does an industrial battery guarantee uninterrupted backup?+

No. Have switching, circuits, power and machine compatibility checked. A peak-shaving function does not establish suitable backup capability.

Does LFP chemistry eliminate fire risk?+

Do not treat battery chemistry as a guarantee of zero risk. Have design, installation, operation and fire-safety requirements assessed by the responsible specialists.

Sources & method

CKW and Groupe E references checked on 7 October 2026. Replace the illustrative calculation with your tariff and measured data.

This content is for information only. For your project, verify prices, grants, timelines, permissions and expected returns with the relevant authorities, grid operator and installer, and check the applicable contracts.

Some pages also invite you to get in touch or highlight services, and may contain other commercial messages from the site operator.

Move from information to action

Receive a personalised estimate, compare your options and prepare your solar project with a clear process.

Callback request