Privacy choice

Google, HubSpot and Reddit are activated after acceptance. Clarity, Meta and Tawk.to can load independently. Details: cookie policy.

Heating June 2026 12 min read

Heat pump, battery and EMS: regulating the Swiss winter without overpaying

Editorial responsibility: Franck Tournier · Report a fix

TL;DR

Measurement rates, reserve costs, solidarity costs and dynamic rates become visible decision lines. This guide shows the elements to check in the quote and contract.

What this changes for your decision

Measurement rates, reserve costs, solidarity costs and dynamic rates become visible decision lines. This guide shows the elements to check in the quote and contract.

For your project, the item “winter controls” should be explained in terms of the building, consumption, grid connection and contract. Ask for the source, date and, for calculated values, the method used.

For your project: In winter, coordinate heating, hot water and daily demand. Set preheating, reserve and tariff windows within agreed comfort and system limits.

Three checks before signing

1. Load curve

Use quarter-hourly or hourly data to justify controllable capacity and uses.

2. Compatibility

Check inverter, EMS, battery, terminal, backup function and cloud dependency together.

3. Life cycle

Compare price, losses, warranty, degradation, replacement and service over the entire duration of use.

References for “Heating” for your project

Note the date of consultation and the scope of each source. National information does not replace or local rate or technical validation of your project.

Compare quotes on a solid basis

Ask for a reference variant and a conservative variant. Each must separate investment, self-consumption, injection, aid, schedule and responsibilities. You will see if the result holds with a less favorable hypothesis.

For the item “winter controls”, the quote should state the data to confirm before work starts, who will check it and how changes will be handled.

Your next step

Prepare utility bill, roof information, existing contracts and comparable quotes. Answer in writing to open questions, then compare net price, annual profit and contractual consequences.

Frequently asked questions

How should you check the item “winter controls” before deciding?+

Measurement rates, reserve costs, solidarity costs and dynamic rates become visible decision lines. This guide shows the elements to check in the quote and contract. The period of application, the conditions of the network operator and the assumptions of the estimate must be explicit.

Which references should you consult on the topic “Heating” for this project?+

Measurement rates, reserve costs, solidarity costs and dynamic rates become visible decision lines. Also check the current information from your municipality, canton or network operator when it applies to the project.

What data should appear in the quote?+

For the item “winter controls”, ask for the assumptions, source and date. The quote should also separate self-consumption, electricity exports, financial support, schedule and responsibilities.

What documents should you prepare before comparing?+

Bring together electricity bill, load profile, roof information, existing contracts and quote variations. Add recent confirmations from the network manager and aid agencies.

Sources & method

Sources 2026/2027: ElCom, pricing structures 2026; Swissolar, Swiss Battery Monitor 2026.

This content is for information only. For your project, verify prices, grants, timelines, permissions and expected returns with the relevant authorities, grid operator and installer, and check the applicable contracts.

Some pages also invite you to get in touch or highlight services, and may contain other commercial messages from the site operator.

Move from information to action

Receive a personalised estimate, compare your options and prepare your solar project with a clear process.

Callback request