Privacy choice

Google, HubSpot and Reddit are activated after acceptance. Clarity, Meta and Tawk.to can load independently. Details: cookie policy.

Grid & storage October 2026 5 min read

Electricity reserves and VPPs: understand your battery’s role

Editorial responsibility: Franck Tournier · Report a fix

TL;DR

Swiss electricity reserves, Swissgrid ancillary services and home backup meet different needs. A virtual power plant contract may use eligible equipment for a defined service. Owning a battery does not automatically provide national remuneration or backup power.

1. Identify the proposed service

The SFOE describes the reserve as protection against critical shortages, using several reserve resources. Swissgrid requires providers to prequalify and enter a framework agreement for the relevant ancillary services. Ask the aggregator which market it serves and its contractual role. Do not confuse these arrangements with storing home solar surplus.

2. Confirm eligible equipment

Obtain written confirmation of accepted models, software, meter, connection and procedures. Specify who performs integration and testing. An API or app does not establish a battery’s admission to the service. Confirm availability dates and conditions before including revenue in a solar quotation.

3. Allocate power and energy

Distinguish available power in kW, usable energy in kWh and activation duration. Simulate repeated requests and periods with a low state of charge. Compare limits with self-consumption and backup needs. One uniform charge threshold does not guarantee backup duration; circuits, loads and the installed system determine it.

4. Calculate net revenue

Request the payment method, guaranteed or variable share, fees and responsibilities. Include losses, purchased energy, wear and foregone feed-in revenue. Check that the model warranty permits the planned use. A commercial annual estimate is not guaranteed income and does not make the battery cost-free.

5. Define control, data and exit terms

Specify remote access, transmitted data, personal reserve, control override and behaviour without connectivity. Check duration, price changes, termination and withdrawal from the service. Keep project grants separate from contract remuneration: a VPP offer does not establish a subsidy for your battery.

References for planning your project

Frequently asked questions

Is my battery automatically part of the Swiss reserve?+

No. Identify the scheme and confirm contractual admission of your equipment.

Can I fully combine VPP service, backup and self-consumption?+

Simulate competing uses and reserves. Do not count the same unavailable energy or power more than once.

Sources & method

SFOE and Swissgrid references checked on 7 October 2026. Request dated service terms and the warranty for your model.

This content is for information only. For your project, verify prices, grants, timelines, permissions and expected returns with the relevant authorities, grid operator and installer, and check the applicable contracts.

Some pages also invite you to get in touch or highlight services, and may contain other commercial messages from the site operator.

Move from information to action

Receive a personalised estimate, compare your options and prepare your solar project with a clear process.

Callback request