Editorial transcript
Pronovo remains a must for the majority of residential installations, and the critical point always remains the same: distinguishing the PRU, generally finalized after commissioning for small installations, from local aid which may have a different timetable.
The video details the information to prepare, the role of the installer and the checks to be made to avoid a refusal or delay in payment.
It also emphasizes possible local subsidies, which must be officially verified and may require a separate administrative timetable.
Related Resources
