Preparing a solar grid connection in Zurich
What to check
The responsible grid operator depends on the address. Confirm who files the application, the export limit and the meter configuration.
- Find the grid operator. Check the address and intended connection point.
- Gather the system details. Collect the inverter information and proposed capacity.
- Ask about exports. Confirm which limits and conditions apply.
- Plan commissioning. Clarify who handles the application and connection steps.