Preparing a solar grid connection in Zurich

What to check

The responsible grid operator depends on the address. Confirm who files the application, the export limit and the meter configuration.

  • Find the grid operator. Check the address and intended connection point.
  • Gather the system details. Collect the inverter information and proposed capacity.
  • Ask about exports. Confirm which limits and conditions apply.
  • Plan commissioning. Clarify who handles the application and connection steps.
Read the full guide

Talk to us about your solar project