Modernization June 2026 12 min read

Add a battery to an existing solar installation before 2027?

Editorial responsibility: Franck Tournier · Report a fix

TL;DR

From January 1, 2027, the legal remuneration model can be based on the market price at the time of injection if the DSO and the producer do not agree on another price. This guide shows the elements to check in the quote and contract.

What this changes for your decision

From January 1, 2027, the legal remuneration model can be based on the market price at the time of injection if the DSO and the producer do not agree on another price. This guide shows the elements to check in the quote and contract.

For your project, the item “retrofit” should be explained in terms of the building, consumption, grid connection and contract. Ask for the source, date and, for calculated values, the method used.

For your project: First check existing inverter compatibility and required work. Compare preparation, immediate retrofit and later retrofit with the same cost and demand assumptions.

Three checks before signing

1. Load curve

Use quarter-hourly or hourly data to justify controllable capacity and uses.

2. Compatibility

Check inverter, EMS, battery, terminal, backup function and cloud dependency together.

3. Life cycle

Compare price, losses, warranty, degradation, replacement and service over the entire duration of use.

References for “Modernization” for your project

Note the date of consultation and the scope of each source. National information does not replace or local rate or technical validation of your project.

Compare quotes on a solid basis

Ask for a reference variant and a conservative variant. Each must separate investment, self-consumption, injection, aid, schedule and responsibilities. You will see if the result holds with a less favorable hypothesis.

For the item “retrofit”, the quote should state the data to confirm before work starts, who will check it and how changes will be handled.

Your next step

Prepare utility bill, roof information, existing contracts and comparable quotes. Answer in writing to open questions, then compare net price, annual profit and contractual consequences.

Frequently asked questions

How should you check the item “retrofit” before deciding?+

From January 1, 2027, the legal remuneration model can be based on the market price at the time of injection if the DSO and the producer do not agree on another price. This guide shows the elements to check in the quote and contract. The period of application, the conditions of the network operator and the assumptions of the estimate must be explicit.

Which references should you consult on the topic “Modernization” for this project?+

From January 1, 2027, the legal remuneration model can be based on the market price at the time of injection if the DSO and the producer do not agree on another price. Also check the current information from your municipality, canton or network operator when it applies to the project.

What data should appear in the quote?+

For the item “retrofit”, ask for the assumptions, source and date. The quote should also separate self-consumption, electricity exports, financial support, schedule and responsibilities.

What documents should you prepare before comparing?+

Bring together electricity bill, load profile, roof information, existing contracts and quote variations. Add recent confirmations from the network manager and aid agencies.

Sources & method

Sources 2026/2027: Federal Council, recovery remuneration 2027; Swissolar, new model of retribution; Swissolar, Swiss Battery Monitor 2026.

This content is for information only. For your project, verify prices, grants, timelines, permissions and expected returns with the relevant authorities, grid operator and installer, and check the applicable contracts.

Some pages also invite you to get in touch or highlight services, and may contain other commercial messages from the site operator.

Move from information to action

Receive a personalised estimate, compare your options and prepare your solar project with a clear process.

Callback request