Buildings & energy ratings October 2026 5 min read

CECB/GEAK and solar: understand the three ratings and compare renovations

Editorial responsibility: Franck Tournier · Report a fix

TL;DR

CECB, called GEAK in German, rates the building envelope, overall energy efficiency and direct CO₂ emissions. PV needs assessment within the building calculation; its capacity does not guarantee a rating improvement. Compare the initial condition and renovation options using current rules.

1. Read the three ratings separately

Each scale runs from A to G and describes a different characteristic. The envelope rating concerns thermal protection, including walls, roof, windows and floors. Overall efficiency also considers systems and energy sources, including on-site electricity generation. The CO₂ scale covers direct heating and hot-water emissions. A favourable rating does not mean zero life-cycle emissions.

2. Have the PV calculation explained

Give the expert the layout, capacity, orientation, shading and generation forecast. Ask how current rules treat generation, self-consumption and surplus. Panels alone are not insulation; associated roof work can have a separate effect. Do not infer the final rating from panel count or a general percentage reduction in grid purchases.

3. Compare heating, the envelope and energy use

Request options with their input data and reference conditions. Heating replacement and envelope renovation affect different parts of the assessment. For a heat pump, request heat demand and seasonal performance rather than applying a fixed electricity-to-heat ratio. Compare monthly profiles too: annual solar generation does not establish winter self-sufficiency.

4. Define the CECB or CECB Plus service

CECB Plus adds an advisory report with renovation options. Request a quote specifying the visit, records, calculations, options and explanations provided. Check whether an existing certificate remains valid after building alterations. Assume neither one national price nor an identical net cost after grants for every project.

5. Separate the rating from financial decisions

Compare work quotations, confirmed grants, future costs and calculated building-specific savings. Check renovation programmes and PV procedures separately; the report is not a grant approval. A better rating guarantees neither resale price nor loan terms. Keep the dated assessment, assumptions, each option’s cost and contractor commitments for your decision.

References for planning your project

Frequently asked questions

Does PV improve insulation?+

Panels alone do not insulate the building. Distinguish their effect from associated roof or envelope work.

Do all three ratings always change together?+

They assess different characteristics. Request each option’s result on all three scales.

Does PV system capacity guarantee rating A?+

No. Have the building and options calculated using their assumptions and the current method.

Does CECB Plus automatically award a grant?+

Check the programme, measure, conditions and timing. An advisory report is not payment confirmation.

Which price should I budget for the report?+

Request a quote for the building and scope. Verify any grant before deducting it.

Sources & method

Official CECB pages checked on 8 October 2026. Specify the calculation version, assumptions and programme conditions for your building.

This content is for information only. For your project, verify prices, grants, timelines, permissions and expected returns with the relevant authorities, grid operator and installer, and check the applicable contracts.

Some pages also invite you to get in touch or highlight services, and may contain other commercial messages from the site operator.

Move from information to action

Receive a personalised estimate, compare your options and prepare your solar project with a clear process.

Callback request