Municipality, school and CEL: enhancing public roofs with local electricity

Editorial responsibility: Franck Tournier · Report a fix

TL;DR

Local electricity communities, virtual RCP and minimum remuneration become operational from 2026. This guide shows the elements to check in the quote and contract.

What this changes for your decision

Local electricity communities, virtual RCP and minimum remuneration become operational from 2026. This guide shows the elements to check in the quote and contract.

For your project, the item “public roofs” should be explained in terms of the building, consumption, grid connection and contract. Ask for the source, date and, for calculated values, the method used.

For your project: Identify public roofs and users who could share electricity. Prepare consistent metering, clear responsibilities and transparent municipal costs.

Three checks before signing

1. Participants

Define buildings, counters, participants, and exit rules before choosing a local model.

2. Facturation

Have the price, metering data, billing and handling of outstanding payments described in writing.

3. Responsibilities

Identify who manages the network, contracts, occupant information and operations.

References for “Municipalities” for your project

Note the date of consultation and the scope of each source. National information does not replace or local rate or technical validation of your project.

Compare quotes on a solid basis

Ask for a reference variant and a conservative variant. Each must separate investment, self-consumption, injection, aid, schedule and responsibilities. You will see if the result holds with a less favorable hypothesis.

For the item “public roofs”, the quote should state the data to confirm before work starts, who will check it and how changes will be handled.

Your next step

Prepare utility bill, roof information, existing contracts and comparable quotes. Answer in writing to open questions, then compare net price, annual profit and contractual consequences.

Frequently asked questions

How should you check the item “public roofs” before deciding?+

Local electricity communities, virtual RCP and minimum remuneration become operational from 2026. This guide shows the elements to check in the quote and contract. The period of application, the conditions of the network operator and the assumptions of the estimate must be explicit.

Which references should you consult on the topic “Municipalities” for this project?+

Local electricity communities, virtual RCP and minimum remuneration become operational from 2026. Also check the current information from your municipality, canton or network operator when it applies to the project.

What data should appear in the quote?+

For the item “public roofs”, ask for the assumptions, source and date. The quote should also separate self-consumption, electricity exports, financial support, schedule and responsibilities.

What documents should you prepare before comparing?+

Bring together electricity bill, load profile, roof information, existing contracts and quote variations. Add recent confirmations from the network manager and aid agencies.

Sources & method

Sources 2026/2027: Federal Council, ordinances of the law on electricity; Swissolar, repertoire electricite-locale.ch; Conseil federal, procedures accelerated 2026.

This content is for information only. For your project, verify prices, grants, timelines, permissions and expected returns with the relevant authorities, grid operator and installer, and check the applicable contracts.

Some pages also invite you to get in touch or highlight services, and may contain other commercial messages from the site operator.

Move from information to action

Receive a personalised estimate, compare your options and prepare your solar project with a clear process.

Callback request