TL;DR

Device restarts can result from a grid interruption, a voltage disturbance or a fault within the building. Have the cause assessed before buying a battery. Solar backup does not automatically provide an uninterruptible power supply.

1. Understand the limits of statistics

SAIDI measures average interruption duration per customer. ElCom’s 2024 report counts interruptions lasting at least three minutes. That report alone cannot establish the frequency or cause of shorter events at your property. Ask for information about your address and the times observed.

2. Record events before drawing conclusions

Record the date, time, affected devices, observed duration and error messages. Keep available logs and ask the DSO whether a matching grid event occurred. A smart plug or device log can miss brief events. An electrical contractor should inspect the installation; where needed, a specialist can select a suitable analyser and interpret its measurements.

3. Define the required continuity

List essential circuits, their power demand and starting currents. Establish the maximum interruption they can tolerate and the runtime required. For medical equipment, have the solution validated by its supplier and the professional responsible for its use. An advertisement for fast switching does not establish compatibility.

4. Check the proposed model’s backup function

Request documentation for the model sold in Switzerland: compatible battery, switching equipment, supplied circuits, power, reserve and restart behaviour. For example, Fronius describes PV Point as a backup circuit with an interruption; its models do not all provide the same functions. Compare solar backup and uninterruptible power separately, then request an appropriate commissioning test.

5. Prepare a damage file

Where possible, keep invoices, photos, logs and the diagnosis before replacing devices. Promptly contact the DSO and insurer and ask which procedure and deadlines apply to your contract. Liability and insurance cover are not automatic. If disputed, have the facts and relevant legal basis assessed before taking formal action.

References for planning your project

Frequently asked questions

Does a solar battery replace a UPS?+

Not automatically. Have switching, power, runtime and device compatibility checked; the presence of a battery does not guarantee uninterrupted power.

Must the DSO always pay for damage?+

Compensation depends on the facts, the link to the event, the contract and the applicable rule. Request a written response and have a refusal assessed before drawing a conclusion.

Sources & method

ElCom’s report and manufacturer documentation checked on 7 October 2026. Check the model version and conditions that apply to your installation.

This content is for information only. For your project, verify prices, grants, timelines, permissions and expected returns with the relevant authorities, grid operator and installer, and check the applicable contracts.

Some pages also invite you to get in touch or highlight services, and may contain other commercial messages from the site operator.

Move from information to action

Receive a personalised estimate, compare your options and prepare your solar project with a clear process.

Callback request