What this changes for your decision
Local electricity communities, virtual RCP and minimum remuneration become operational from 2026. This guide shows the elements to check in the quote and contract.
For your project, the item “governance” should be explained in terms of the building, consumption, grid connection and contract. Ask for the source, date and, for calculated values, the method used.
For your project: Present roles, costs, billing and data access to the owners’ meeting. Clarify ownership changes and exits before voting.
Three checks before signing
1. Participants
Define buildings, counters, participants, and exit rules before choosing a local model.
2. Facturation
Have the price, metering data, billing and handling of outstanding payments described in writing.
3. Responsibilities
Identify who manages the network, contracts, occupant information and operations.
References for “Condominiums (PPE)” for your project
- Federal Council, ordinances of the law on electricity: Local electricity communities, virtual RCP and minimum remuneration become operational from 2026.
- Swissolar, repertoire electricite-locale.ch: The repertoire electricite-locale.ch facilitates the research of prestataires for RCP/ZEV, RCP virtual and CEL/LEG.
Note the date of consultation and the scope of each source. National information does not replace or local rate or technical validation of your project.
Compare quotes on a solid basis
Ask for a reference variant and a conservative variant. Each must separate investment, self-consumption, injection, aid, schedule and responsibilities. You will see if the result holds with a less favorable hypothesis.
For the item “governance”, the quote should state the data to confirm before work starts, who will check it and how changes will be handled.
Your next step
Prepare utility bill, roof information, existing contracts and comparable quotes. Answer in writing to open questions, then compare net price, annual profit and contractual consequences.