Permissions June 2026 12 min read

Accelerated procedure 2026: solar projects of national interest

Editorial responsibility: Franck Tournier · Report a fix

TL;DR

Accelerated procedures for production facilities of national interest come into force on April 1, 2026. This guide shows the elements to check in the quote and contract.

What this changes for your decision

Accelerated procedures for production facilities of national interest come into force on April 1, 2026. This guide shows the elements to check in the quote and contract.

For your project, the item “entry into force” should be explained in terms of the building, consumption, grid connection and contract. Ask for the source, date and, for calculated values, the method used.

For your project: Check whether your project qualifies for an accelerated procedure. Rules for installations of national interest do not automatically apply to a residential roof.

Three checks before signing

1. Feasibility

Check structure, roof condition, fire, access, connection and authorizations before ordering.

2. Perimeter

Distinguish between house, facade, large installation and special surface, because the procedures differ.

3. Decision date

Have rules, aids and technical proofs confirmed just before signing.

References for “Permissions” for your project

Note the date of consultation and the scope of each source. National information does not replace or local rate or technical validation of your project.

Compare quotes on a solid basis

Ask for a reference variant and a conservative variant. Each must separate investment, self-consumption, injection, aid, schedule and responsibilities. You will see if the result holds with a less favorable hypothesis.

For the item “entry into force”, the quote should state the data to confirm before work starts, who will check it and how changes will be handled.

Your next step

Prepare utility bill, roof information, existing contracts and comparable quotes. Answer in writing to open questions, then compare net price, annual profit and contractual consequences.

Frequently asked questions

How should you check the item “entry into force” before deciding?+

Accelerated procedures for production facilities of national interest come into force on April 1, 2026. This guide shows the elements to check in the quote and contract. The period of application, the conditions of the network operator and the assumptions of the estimate must be explicit.

Which references should you consult on the topic “Permissions” for this project?+

Accelerated procedures for production facilities of national interest come into force on April 1, 2026. Also check the current information from your municipality, canton or network operator when it applies to the project.

What data should appear in the quote?+

For the item “entry into force”, ask for the assumptions, source and date. The quote should also separate self-consumption, electricity exports, financial support, schedule and responsibilities.

What documents should you prepare before comparing?+

Bring together electricity bill, load profile, roof information, existing contracts and quote variations. Add recent confirmations from the network manager and aid agencies.

Sources & method

Sources 2026/2027: Conseil federal, procedures accelerated 2026.

This content is for information only. For your project, verify prices, grants, timelines, permissions and expected returns with the relevant authorities, grid operator and installer, and check the applicable contracts.

Some pages also invite you to get in touch or highlight services, and may contain other commercial messages from the site operator.

Move from information to action

Receive a personalised estimate, compare your options and prepare your solar project with a clear process.

Callback request